Kaira Looro, slide 1 of 6
What I work on
Low-carbon construction
Most of a building's carbon is decided before anyone draws a detail. The interesting work is upstream, in what gets chosen and what gets kept.
Timber, at the scale it is built
Mass timber is a construction logic before it is a material preference. It changes the grid, the connections and the sequence on site.
Computation as a drawing tool
Parametric work earns its place when it answers a question faster than a drawing can. Otherwise it is decoration with extra steps.
Practice
- Perkins&WillVancouver, CanadaFebruary – July 2026
- Chernoff Thompson ArchitectsVancouver, CanadaMarch – September 2025
- Studio Huizenga ArchitectureVancouver, CanadaMay – September 2025




